Paper 09126 "Preparing for Close-Interval Survey" (download $10 for NACE members, $13 for non-members) was presented at the Corrosion/2009 Close-Interval Survey Symposium. The paper was based on a Feb, 1998 Materials Performance article titled “Close Interval Potential Surveys—Planning, Execution, Results” by Robin Pawson. The paper updates the topic for new technology and direct assessment. More information can be found in NACE SP0207-2007 “Performing Close-Interval Potential Surveys on Buried or Submerged Metallic Pipelines” (free download for NACE members) published in 2007.
Drew Hevle
Chair, 2009 Close-Interval Survey Symposium
Friday, September 11, 2009
Subscribe to:
Post Comments (Atom)
Hey: I'm a NACE member, shouldn't this paper be free to ME????
ReplyDelete-member
Dear Member,
ReplyDeleteI agree that the paper should be free to you. Maybe you could talk to someone at NACE about that. I believe that only current NACE papers (published within the last five years) require a fee for download.
- Inspector Protector, The Corrosion Blog editor