Showing posts with label Utilities. Show all posts
Showing posts with label Utilities. Show all posts

Monday, April 26, 2010

Opposing Group Says Nuclear Reactor Design Has Corrosion Risks

An anti-nuclear coalition says design flaws in Westinghouse’s AP1000 reactor could allow radiation leaks during an accident, and it is calling on federal authorities to suspend licensing and loan guarantees for plants that use it.

The AP1000 Oversight Group (PDF, 12k), made up of 11 environmental organizations, released a report (PDF, 4.46M) Wednesday detailing what it calls a serious safety issue that the Nuclear Regulatory Commission has not addressed on the AP1000 reactor.

The report contends Westinghouse designed the reactor without a corrosion-proof backup to protect against leaks from the containment vessel. In a reactor accident, the reactor’s safety systems would allow any radioactive material that had leaked over time to be released into the air and spread to nearby populated areas, the group contends.

From the Charlotte Business Journal (links added).

Thursday, December 10, 2009

Learn the latest on distribution integrity management plans (DIMP)


As part of Pipeline Integrity Month
in January 2010, NACE International is bringing the Data and Integrity Management Workshop to Houston.  This half day event will cover topics on external corrosion direct assessment (ECDA) and data integration management plans.

The Data and Integrity Management Workshop is being held in conjunction with PIMS Houston 2010: Investigating the 80% Rule. The combined events allow you to save on travel costs while learning how to reduce the risk of corrosion and other defects impacting pipeline integrity and safety in one location.



 




With registration to the Data & Integrity Management Workshop the Pipeline Integrity Web Series in January 2010 is FREE (a $200 value).



  Technical Program Highlights:


-   Integrated Engineering with Guided Wave and Other 
      Advanced Assessment Techniques


-   Quality Data Collection Recognition


-   ECDA: Direct Examination - Data Collection 
      During Excavations


-   ECDA and Data Integration


-   Gas Distribution Integrity Management Plan (DIMP)


-   Cased Crossing Monitoring and Criteria

When:
January 25, 2009


Time:
8:00 a.m. - 12:00 p.m.


Where:
JW Marriott Houston
5150 Westheimer
Houston, Texas 77056
 










Quick Links:


Travel


Hotel


Events





Event Sponsor:

Rosen Web 2
 



                        






 


 Register Today!


Register by January 5th and save $75!